Fabrication


Our current production facilities cover some 2130 m2 of workshop space.

Workshop 1 = 1680 m2
Workshop 2 = 450 m2

Fabrication capacity is currently at 85-100 tonnes per week (dependent on type of fabrication).

Inspection:-

MPI and  UT inspection carried out by PCN qualified personnel.

Technical facts:-

  • Maximum lift: 10 tonnes
  • Number of cranes: 3 (5 tonnes each)

Surface Treatments available:-

  • Shot Blasting to SA 2.5 standard
  • Primer (High build/epoxy)
  • Galvanizing
  • Powder Coating

Click here to download our fabrication profile.


 
© Copyright 2012 Temple Mill Steelwork Engineering All rights reserved.
Registered address 12-14 Percy Street, Rotherham. Registered No 429 7032 England.